Veritas™ 5250 Appliance Hardware Installation Guide
- Hardware overview
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Best practices for rack installation
- Determining rack locations
- Storage shelf rack requirements
- Heat dissipation
- Verifying SAS-3 cable length
- Prerequisites for IPMI configuration
- S Series Appliance installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Attaching the storage shelf bezel
- Installing the appliance rack rails
- Installing the appliance into a rack
- Understanding appliance and S Series Storage Shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- D Series Appliance installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Installing the appliance rack rails
- Installing the appliance into a rack
- Understanding appliance and D Series Storage Shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- Next steps after installation
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the IPMI port from the NetBackup Appliance Shell Menu
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Overview
- Preparing the appliance
- Removing the appliance cover
- Installing the Expansion Storage Kit components
- Replacing the appliance cover
- Connecting the S Series storage shelves to the appliance
- Connecting one S Series storage shelf to an appliance
- Connecting two S Series storage shelves to an appliance
- Connecting three S Series storage shelves to an appliance
- Connecting four S Series storage shelves to an appliance
- Connecting the fifth S Series storage shelf to an appliance
- Connecting the sixth S Series storage shelf to an appliance
- Connecting the D Series storage shelves to the appliance
- Connecting one D Series storage shelf to an appliance
- Connecting two D Series storage shelves to an appliance
- Connecting three D Series storage shelves to an appliance
- Connecting four D Series storage shelves to an appliance
- Connecting the fifth D Series storage shelf to an appliance
- Connecting the sixth D Series storage shelf to an appliance
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Overview
- Moving the MSDP partition from a base disk to an expansion disk for optimum performance
- Additional storage shelf scenarios
- Installing S Series storage shelves to an appliance that has at least one storage shelf
- Recabling to connect additional S Series storage shelves
- Installing D Series storage shelves to an appliance that has at least one storage shelf
- Recabling to connect additional D Series storage shelves
- Appendix C. Configuring the disk space for new NetBackup Expansion Storage Shelves
- Appendix D. Configuring the disk space for new Flex Expansion Storage Shelves
- Index
Storage shelf rear panel
The rear panel of the S Series Storage Shelf contains two main components; two Power Cooling Modules (PCMs) and two I/O Module canisters.
The PCMs, located on the left and the right sides of the storage shelf, contain fans.
The I/O module canisters are located in the center of the rear panel, one on top of the other. Each I/O module contains three mini-SAS HD ports; A, B, and C. The mini-SAS HD ports connect the I/O modules to the appliance and to other storage shelves. Note that the port labels are reversed on the bottom canister. Port C is not used at this time.
The PCMs and the I/O modules include LEDs.
The rear panel of the D Series Storage Shelf contains two power supply units or cooling fan modules, primary enclosure management module, secondary enclosure management module, information tag and power switches.
The PCMs, located on the left and the right sides of the storage shelf, contain fans.
The I/O module canisters are located in the center of the rear panel, one on top of the other. Each I/O module contains four mini-SAS HD ports - 1, 2, 3, and 4. The mini-SAS HD ports connect the I/O modules to the appliance and to other storage shelves.
The PCMs and the I/O modules include LEDs.