Please enter search query.
Search <book_title>...
Veritas NetBackup™ Release Notes
Last Published:
2021-01-15
Product(s):
NetBackup (8.3.0.1)
- About NetBackup 8.3.0.1
- New features, enhancements, and changes
- NetBackup 8.3.0.1 new features, changes, and enhancements
- Operational notes
- NetBackup installation and upgrade operational notes
- NetBackup administration and general operational notes
- NetBackup administration interface operational notes
- NetBackup Bare Metal Restore operational notes
- NetBackup Cloud operational notes
- NetBackup with Veritas CloudPoint operational notes
- NetBackup deduplication operational notes
- NetBackup internationalization and localization operational notes
- NetBackup for NDMP operational notes
- NetBackup Snapshot Client operational notes
- NetBackup virtualization operational notes
- Appendix A. About SORT for NetBackup Users
- Appendix B. NetBackup installation requirements
- Appendix C. NetBackup compatibility requirements
- Appendix D. Other NetBackup documentation and related documents
VMware protection plan creation can fail when automatic scheduling and WORM storage are used
The protection plan creation does not work for the VMware workload when you select the following options:
All schedule frequencies are set to less than one week.
The WORM storage has a valid Lock Maximum Duration that is less than one week greater than the requested retention period.
Workaround: If you use a protection plan to protect VMware with WORM capable storage, set the WORM storage Lock Maximum Duration to greater than one week. Or, explicitly select the schedule type in the protection plan.