Please enter search query.
Search <book_title>...
Veritas NetBackup™ 5240 Appliance Hardware Installation Guide
Last Published:
2020-05-06
Product(s):
Appliances (Version Not Specified)
Platform: Veritas 5240
- Hardware overview
- Preinstallation requirements
- Installation procedures
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Appendix C. Adding the disk space of additional storage shelves
Connecting a storage shelf to an appliance that already has three operating shelves
To connect a storage shelf to an appliance that already has three operating shelves
- Remove the connector from the port that is marked with a red X.
- Reconnect the cable to the port that is marked with a green circle.
- Connect the two new SAS-3 cables that ship with each storage shelf, as shown.
- Connect power cords between the new storage shelf and separate Power Distribution Units (PCUs) in the rack.
- Turn on the new storage shelf. Let the shelf initialize for a few minutes.
- Verify that the new shelf functions correctly.
Refer to the following section for details.