Veritas Appliance Safety and Maintenance Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: Veritas 3350,Veritas 3340,Veritas 5150,Veritas 5250,Veritas 5340,Veritas 5350,Veritas 5220,Veritas 5230,Veritas 5240,Veritas 5330,Veritas 5260,Veritas 5360,Veritas 3360

Maintenance requirements and time frames

The following table describes maintenance requirements and time frames for hardware and software components.

Table: Routine requirements and time frames

Owner

Site

Required actions

Recommended time frame

Maintenance engineers

Device site

Check equipment room and device surroundings

Daily

Check rack cabinet

Monthly

Check all indicator LEDs on the front panel of the device

Daily for the first week of operation

Weekly after the first week

Check all indicator LEDs on the rear panel of the device

Daily for the first week of operation

Weekly after the first week

Network engineers

Management software site

Check the CPU status

Daily for the first week of operation

Weekly after the first week

Check the disk status

Daily for the first week of operation

Weekly after the first week

Check the RAID status

Daily for the first week of operation

Weekly after the first week

Check the fan status

Daily for the first week of operation

Weekly after the first week

Check the power supply status

Daily for the first week of operation

Weekly after the first week

Check the FC HBA status

Daily for the first week of operation

Weekly after the first week

Check the 25GE/10GE NIC status

Daily for the first week of operation

Weekly after the first week

Check the RAID and SAS HBA card status

Daily for the first week of operation

Weekly after the first week

See Maintenance tools.