Veritas Appliance Safety and Maintenance Guide
Maintenance requirements and time frames
The following table describes maintenance requirements and time frames for hardware and software components.
Table: Routine requirements and time frames
Owner | Site | Required actions | Recommended time frame |
---|---|---|---|
Maintenance engineers | Device site | Check equipment room and device surroundings | Daily |
Check rack cabinet | Monthly | ||
Check all indicator LEDs on the front panel of the device | Daily for the first week of operation Weekly after the first week | ||
Check all indicator LEDs on the rear panel of the device | Daily for the first week of operation Weekly after the first week | ||
Network engineers | Management software site | Check the CPU status | Daily for the first week of operation Weekly after the first week |
Check the disk status | Daily for the first week of operation Weekly after the first week | ||
Check the RAID status | Daily for the first week of operation Weekly after the first week | ||
Check the fan status | Daily for the first week of operation Weekly after the first week | ||
Check the power supply status | Daily for the first week of operation Weekly after the first week | ||
Check the FC HBA status | Daily for the first week of operation Weekly after the first week | ||
Check the 25GE/10GE NIC status | Daily for the first week of operation Weekly after the first week | ||
Check the RAID and SAS HBA card status | Daily for the first week of operation Weekly after the first week |
See Maintenance tools.