Veritas™ 5260 Appliance Hardware Installation Guide
- Hardware overview
- Preinstallation requirements
- Customer-provided environment and supplies
- Appliance shipping container contents
- Storage shelf shipping container contents
- Best practices for rack installation
- Determining rack locations
- Storage shelf rack requirements
- Heat dissipation
- Verifying SAS-3 cable length
- Prerequisites for IPMI configuration
- Installation procedures
- Installing the storage shelf rack rails
- Installing the storage shelf into a rack
- Installing the appliance rack rails
- Installing the appliance into a rack
- Understanding appliance and storage shelf connections
- Connecting an appliance to one storage shelf
- Connecting an appliance to more than one storage shelf
- Next steps after installation
- Connecting the network cables
- Connecting the power cords
- Turning on the hardware and verifying operation
- Configuring the Veritas Remote Management Interface from a Flex Appliance
- Configuring the Veritas Remote Management Interface using laptop
- Accessing and using the Veritas Remote Management interface
- Appendix A. Adding one or more storage shelves to an operating appliance that does not have any storage shelves
- Appendix B. Adding storage shelves to an operating appliance that has at least one storage shelf attached
- Appendix C. Configuring the disk space for new Flex Expansion Storage Shelves
- Index
Best practices for rack installation
Prepare for the hardware installation by following these recommendations.
The appliance requires two RUs of space. Install the appliance in the space that is directly above the storage shelves.
Two people should install the rails; one person at the back of the rack and one at the front.
Two people should lift and place the appliance into the mounted rails.
The storage shelves are heavier than the appliance and should be installed as close to the bottom of the rack as possible.
Always install the heavier storage shelves at the bottom of the rack. Best practices recommend that you install hardware at the bottom of a rack first. Then work your way up the rack.
Determine device order and cabling limits.
Be aware of the depth of the guide rails and the devices. Ensure that the distance between cabinet posts accommodates the rails, devices, cables, and extending ears.
Physically hold a SAS-3 cable between the intended locations for the appliance and the last storage shelf. Visually confirm that the cable is long enough.