Veritas™ 5340 Appliance Hardware Installation Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: Veritas 5340
  1. Hardware overview
    1.  
      Supported software
    2.  
      5340 compute node and 5U84 storage shelves
    3.  
      5340 compute node and storage shelf power requirements
    4.  
      5340 compute node disk drives
    5.  
      5340 compute node control panel
    6.  
      5340 compute node rear panel
    7.  
      5U84 storage shelf drawers and disk drives
    8.  
      5U84 storage shelf control panel
    9.  
      5U84 storage shelf rear panel
    10.  
      5U84 storage shelf RAID controller
    11.  
      5U84 storage shelf Expansion module
    12.  
      Cables and connectors
  2. Preinstallation requirements
    1.  
      Customer-provided environment and supplies
    2.  
      Storage shelf shipping container contents
    3.  
      Compute node shipping container contents
    4.  
      Dimensions and determining rack locations
    5.  
      Best practices for rack installation
    6.  
      Heat dissipation guidelines
    7.  
      Cable length verification
    8.  
      Prerequisites for IPMI configuration
  3. Hardware installation procedures
    1.  
      Overview
    2.  
      Installing a storage shelf
    3.  
      Installing disk drives into a full-capacity storage shelf
    4.  
      Installing disk drives and blanks into a half-capacity storage shelf
    5.  
      Installing SFPs into the RAID controller
    6.  
      Installing the compute node rack rails
    7.  
      Installing the compute node into a rack
    8.  
      Connecting the hardware to one node
    9.  
      Connecting the hardware to two nodes
    10.  
      Connecting NetBackup nodes to the network
    11.  
      Connecting Flex nodes to the network
    12.  
      Connecting the power cords to the hardware
    13.  
      Turning on the hardware and verifying operation
    14.  
      Configuring the IPMI port from the NetBackup Appliance Shell Menu
    15.  
      Accessing and using the Veritas Remote Management interface
  4. Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion shelf to the Primary shelf
    5.  
      Connecting two Expansion shelves to the Primary shelf
    6.  
      Connecting three Expansion shelves to the Primary shelf
  5. Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion shelf to a system that has one existing Expansion shelf
    5.  
      Connecting two Expansion shelves to a system that has one existing Expansion shelf
    6.  
      Connecting one Expansion shelf to a system that has two existing Expansion shelves
  6. Appendix C. Configuring the disk space for new NetBackup Expansion Storage Shelves
    1.  
      Adding the disk space of an Expansion Storage Shelf from the NetBackup Appliance Web Console
    2.  
      Adding the disk space of an Expansion Storage Shelf from the NetBackup Appliance Shell Menu
  7. Appendix D. Configuring the disk space for new Flex Expansion Storage Shelves
    1.  
      Adding the disk space of an Expansion Storage Shelf from the Flex Appliance Console

Installing the compute node rack rails

Veritas recommends the following.

  • The compute node requires two RUs of space. Install the node in the space that is directly above the storage shelves.

  • Always install the heavier storage shelves at the bottom of the rack. Best practices recommend that you install hardware at the bottom of a rack first. Then work your way up the rack.

  • Two people should install the rails; one person at the back of the rack and one at the front.

  • Two people should lift and place the compute node into the mounted rails.

To install the compute node rails

  1. Identify the front and the rear of each rail. The following illustration shows the front of the left-hand and the right-hand rails. The front of the left rail is labeled A. The front of the right rail is labeled B. The labeled sides face the rack wall when the rails are installed.

    The small metal extensions that are outlined in the illustration must point down, towards the floor of the rack.

    Note:

    The information in this document supersedes any of the information in the printed installation materials.

  2. Use the printed rack templates to align the rails with the rack holes.

    Fold the template along the yellow dotted lines to create an exact, physical match to the rack.

    Be sure to use the same holes on each side of the rack.

  3. Place one rail inside the rack.
    • The rack holes and the rail pins should match the template.

    • Use the same 1RU space and holes in the front and the rear of the rack.

    • Align the pins in the top holes and the bottom holes of the top RU.

    • Move the rail front and back to fit into the rack.

    • Slide the rail forward until the pins click into the rack holes.

  4. Secure the rear of the rail.
    • Push the blue lock toward the rack wall and toward the back of the rail.

    • The lock must be behind the rack post.

    • Ensure that the lock clicks into place.

  5. Insert a washer and a screw into the middle hole of the top RU in the rear of the rack.
  6. Repeat steps 3 through 5 for the other rail.
  7. Identify the three different rails in each rail assembly.

    Components in this illustration are as follows.

    • 1 - Outer rail

    • 2 - Intermediate rail

    • 3 - Inner rail

  8. Pull the white tab forward to release the inner rail from the outer and the intermediate rail.
  9. Separate the inner rail from the other rail components in the rack.
  10. Attach the inner rail to the left and the right sides of the chassis at the four attachment locations.
    The rails click into place when properly installed.