Veritas™ 5340 Appliance Hardware Installation Guide

Last Published:
Product(s): Appliances (Version Not Specified)
Platform: Veritas 5340
  1. Hardware overview
    1.  
      Supported software
    2.  
      5340 compute node and 5U84 storage shelves
    3.  
      5340 compute node and storage shelf power requirements
    4.  
      5340 compute node disk drives
    5.  
      5340 compute node control panel
    6.  
      5340 compute node rear panel
    7.  
      5U84 storage shelf drawers and disk drives
    8.  
      5U84 storage shelf control panel
    9.  
      5U84 storage shelf rear panel
    10.  
      5U84 storage shelf RAID controller
    11.  
      5U84 storage shelf Expansion module
    12.  
      Cables and connectors
  2. Preinstallation requirements
    1.  
      Customer-provided environment and supplies
    2.  
      Storage shelf shipping container contents
    3.  
      Compute node shipping container contents
    4.  
      Dimensions and determining rack locations
    5.  
      Best practices for rack installation
    6.  
      Heat dissipation guidelines
    7.  
      Cable length verification
    8.  
      Prerequisites for IPMI configuration
  3. Hardware installation procedures
    1.  
      Overview
    2.  
      Installing a storage shelf
    3.  
      Installing disk drives into a full-capacity storage shelf
    4.  
      Installing disk drives and blanks into a half-capacity storage shelf
    5.  
      Installing SFPs into the RAID controller
    6.  
      Installing the compute node rack rails
    7.  
      Installing the compute node into a rack
    8.  
      Connecting the hardware to one node
    9.  
      Connecting the hardware to two nodes
    10.  
      Connecting NetBackup nodes to the network
    11.  
      Connecting Flex nodes to the network
    12.  
      Connecting the power cords to the hardware
    13.  
      Turning on the hardware and verifying operation
    14.  
      Configuring the IPMI port from the NetBackup Appliance Shell Menu
    15.  
      Accessing and using the Veritas Remote Management interface
  4. Appendix A. Adding Expansion Storage Shelves to an operating appliance that does not have any Expansion shelves
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion shelf to the Primary shelf
    5.  
      Connecting two Expansion shelves to the Primary shelf
    6.  
      Connecting three Expansion shelves to the Primary shelf
  5. Appendix B. Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
    1.  
      Overview
    2.  
      Turning off the existing hardware
    3.  
      Installation instructions
    4.  
      Connecting one Expansion shelf to a system that has one existing Expansion shelf
    5.  
      Connecting two Expansion shelves to a system that has one existing Expansion shelf
    6.  
      Connecting one Expansion shelf to a system that has two existing Expansion shelves
  6. Appendix C. Configuring the disk space for new NetBackup Expansion Storage Shelves
    1.  
      Adding the disk space of an Expansion Storage Shelf from the NetBackup Appliance Web Console
    2.  
      Adding the disk space of an Expansion Storage Shelf from the NetBackup Appliance Shell Menu
  7. Appendix D. Configuring the disk space for new Flex Expansion Storage Shelves
    1.  
      Adding the disk space of an Expansion Storage Shelf from the Flex Appliance Console

Turning off the existing hardware

You must turn off the existing system before you turn on any new Expansion shelves. Be sure to perform these steps in the order that they are presented.

To turn off the existing hardware

  1. Perform a soft shutdown of any compute nodes. If you have two compute nodes you must shut them down separately.
    • From the NetBackup Appliance Shell Menu, enter Support > Shutdown, or from the Flex Appliance Shell, enter system > shutdown.

    • Verify that the compute node is completely turned off. All LEDs are off. Fans are not running.

    • Repeat these steps for a second compute node if applicable.

  2. After the compute nodes are turned off you must manually turn off the storage shelves.
    • Turn off the Primary shelf first.

    • Then turn off the Expansion shelf.

    • If you have a second Expansion shelf turn it off last.

  3. Locate the on/off switches on the two power supplies on the rear of the storage shelves. The switches are in the same location for the Primary shelf and for the Expansion shelves.
  4. Press the switches on the Primary shelf to off.
  5. Press the switches on the Expansion shelf that is closest to the Primary shelf to off.
  6. If you have a second Expansion shelf press the switches to off.